Kitchen Renovation

Kitchen renovations in Vihti, Espoo and Lohja. We remove the old kitchen, install the cabinets, countertops and appliances according to the cabinet supplier's plan, and take away the demolition waste. We coordinate the electrical and plumbing work into the same schedule.

We renovate kitchens in Vihti and Lohja, as well as in Espoo, Helsinki and Kauniainen.

  • ✓ The same person from the first day to the last
  • ✓ The price doesn't go up unless you decide

“Everything went really quickly and smoothly, in record time, from buying the materials to the finished floor.”

Elli S., Google review
Before: full kitchen renovation, Espoo After: full kitchen renovation, Espoo After
Price from
€3,500
replacing the cabinets, labor only
Duration
4–7 working days
typical cabinet replacement
Household deduction
40%
of the labor portion, max €2,100 per person
Site visit
Free
doesn't commit you to anything

01 / What's included in a kitchen renovation

What's included in a kitchen renovation

The cabinet supplier designs the kitchen, and we carry it out from the demolition to the last piece of trim. If there's something unusual about your kitchen, like a slanted wall or an old structure, tell us right away.

+ we handle ourselves − we refer onward

  • We take the demolition waste.

    Cabinets, countertops and appliances removed. We take the demolition waste with us, so you don't need a separate container.

  • Straight, tight and adjusted.

  • Cut to size, openings made on site.

  • Connected to existing connections.

  • Tiling, painting, trim, floor.

  • → Electrical contractor, we coordinate

  • → Plumbing contractor, we coordinate

  • → Cabinet supplier

  • → You, unless agreed separately

Veeti behind the wheel of the work van

02 / Who does the work

A local business, not an anonymous contractor

I'm Veeti Huotari. We do the renovations ourselves and don't pass the work on. The same person comes to your home every day, and when you call, you talk to the person who does the work.

We treat every property as if it were our own.

I've done property maintenance and renovations in Uusimaa since 2019. I'm responsible for the work myself, from the first call to the last piece of trim.

03 / Our work

Kitchen renovations before and after

Before: Kitchen renovation, Espoo After: Kitchen renovation, Espoo

Kitchen renovation

Old cabinets and countertops replaced with light-colored doors, a new countertop and a new floor.

Before: New kitchen floor, Helsinki After: New kitchen floor, Helsinki

New kitchen floor

Stylish laminate installed over old rubber flooring.

04 / Price

How much does a kitchen renovation cost?

The price depends on how much is removed and whether electrical points or water points are moved. The prices are for labor only: you buy the cabinets and appliances yourself from the supplier, and we don't add a markup to them.

Price examples

labor only, incl. VAT 25.5%

  • Replacing the cabinets

    no changes to electrical or water points

    about €3,500–5,500

  • Cabinets and surface work

    backsplash tiling, painting, flooring

    about €6,000–9,500

  • Full renovation

    electrical and plumbing work, contractors coordinated

    about €11,000–17,000

What affects the price

What determines the price

These factors affect the price the most.

The more of the old kitchen is removed, the more work and demolition waste there is.

Electrical and plumbing contractors do the moves, and we coordinate them into the schedule.

This estimate isn't a quote. You'll get an exact price as a written quote after a free site visit.

05 / Extra work

If the demolition reveals a surprise, you decide

Under the wall or floor of an old kitchen, we sometimes find moisture damage, rotten wood or a structure that can't be left as it is. Then we always do the same thing.

  1. 01

    The work stops at that point.

  2. 02

    We call you the same day and tell you what we found and what the repair costs.

  3. 03

    We only continue once you have approved the price of the extra work.

We don't promise the price will never go up. We promise it won't go up unless you decide.

06 / Timeline

How long does a kitchen renovation take?

  • Replacing the cabinets 4–7 working days
  • Cabinets and surface work 8–12 working days
  • Full renovation 3–5 weeks

You get the schedule in writing with the quote. If anything changes, we tell you right away.

You can live at home during the whole renovation

When the cabinets are replaced, the kitchen is out of use for about 5–8 days. At the site visit, we agree on where a temporary kitchen corner will be.

  • Walkways and the rooms next to the kitchen are protected
  • Dust control: a dust extractor and protective plastic, and negative pressure during demolition when needed
  • The floor is cleaned at the end of every day
  • Working hours are agreed in advance, usually 7:30 am–4 pm on weekdays
  • We tell you about the noisiest days in advance

07 / How it works

From call to finished kitchen in five steps

Call

Tell us roughly what you have in mind. We usually reply the same day.

Site visit

We come to your home, take measurements, look at the structures and ask what you're looking for. Free, and it doesn't commit you to anything.

Written quote

The price, scope and schedule on paper. We go through it together.

Renovation

An agreed schedule, agreed working hours, the same person the whole time.

Handover

We go through it together and fix any defects before the invoice is sent.

08 / FAQ

Frequently asked questions about kitchen renovation

Didn't find your answer? Call +358 44 724 5824 and let's talk.

Can I live at home during the renovation? + −

Yes. Walkways and the rooms next to the kitchen are protected, and at the site visit we agree on where a temporary kitchen corner will be.

Where do I buy the cabinets, or do you handle that? + −

You buy the cabinets and appliances yourself from a supplier (e.g. IKEA, Puustelli, EPOQ), who also designs the kitchen. We handle the demolition and installation.

What if the price goes up during the work? + −

If we find something during the demolition, the work stops at that point and we call you the same day. We only continue once you have approved the price of the extra work.

Who does the electrical and plumbing work? + −

We order it from a contractor and coordinate it into the schedule. You don't have to call several different companies yourself.

How much household deduction do I get? + −

40% of the labor portion, with a deductible of €150 and a maximum of €2,100 per person per year. For example, for €4,000 of labor you get €1,450 back.

Can't find what you're looking for? Call us and we'll help.