Fences & Railings

You get the fence or railing from the same people from start to finish, from removing the old one to the last board. The posts are set to withstand frost heave, so the fence stays straight for years and doesn't lean after the first winter.

  • ✓ We usually reply the same day
  • ✓ Work often starts the same week
Before: building and painting a porch railing, Espoo After: building and painting a porch railing, Espoo After

01 / What's included and what isn't

What's included and what isn't

The most common reason to be disappointed with a fence is that it leans after the first winter, when frost lifts badly set posts. That's why we set the posts below the frost line or on ground screws, depending on the soil, and railings are always fixed to load-bearing structures.

+ we handle ourselves − we refer onward

  • Custom-built privacy, boundary and dog fences to suit your plot.

02 / Our work

Our work

Before: Building and painting a porch railing, Espoo After: Building and painting a porch railing, Espoo After

Building and painting a porch railing

A new railing built on the porch and painted white.

Espoo
Before: The old railing is removed and the waste is collected.Step 2 / 3: The new posts are fixed to the frame and straightened with a laser. Before

Replacing a loading dock railing

The old white railing removed and a new lattice railing built in its place.

Espoo
01 / 03

The old railing is removed and the waste is collected.

Before: Repairing a stair railing, Espoo After: Repairing a stair railing, Espoo After

Repairing a stair railing

A broken lattice railing repaired and painted, and rotten parts replaced with new ones.

Espoo
Building a terrace railing, Kirkkonummi

Building a terrace railing

A baluster railing built around a shore terrace.

Kirkkonummi

03 / Price

How much does a fence or railing cost?

Choose the fence type and length to see the installed price. Materials, labor and VAT 25.5% are included.

1. Fence type
2. Length
25 lm
3. Gates

Length in linear meters (lm). Removing and hauling away an old fence €62/h.

Examples

  • 25 m vertical board fence + pedestrian gate

    25 lm × €110 €2,750
    Pedestrian gate €650
    Total about €3,400
  • 40 m wire mesh fence

    40 lm × €55 €2,200
    Total about €2,200
  • 12 m wooden railing

    12 lm × €210 €2,520
    Total about €2,500

What affects the price

What determines the price

These factors affect the price the most.

The longer and higher the fence, the more material and work it takes.

See the material comparison below.

Stony ground and bedrock slow down installing the posts.

Gates, removing the old fence and hauling away waste.

Prices incl. VAT 25.5%, installed and including materials. Travel outside the service area €1.00/km. This estimate isn't a quote.

04 / Material comparison

Material comparison

Vertical board fence

Suits
Privacy, noise
Lifespan
15–25 years
Maintenance
Paint or stain every few years
Privacy
Good
Appearance
Traditional, suits an older yard

Horizontal slat fence

Suits
Privacy, a modern yard
Lifespan
15–25 years
Maintenance
Stain every few years
Privacy
Adjustable with the gap width
Appearance
Modern, clean lines

Wire mesh fence

Suits
Children, a dog, marking the plot boundary
Lifespan
25+ years
Maintenance
Hardly any maintenance
Privacy
None
Appearance
Discreet, doesn't block the view

Composite fence

Suits
Privacy without maintenance
Lifespan
25+ years
Maintenance
Washing only
Privacy
Good
Appearance
Even, lasting color

Cheapest: wire mesh fence · Privacy: board fence · Modern look: horizontal slats · No maintenance: composite

Railings are made in wood, glass or wire rope to suit the site and the regulations.

05 / How it works

From call to finished fence in four steps

  1. Contact

    Call or fill in the form. We usually reply the same day.

  2. Free site visit

    We come to the site and look at the boundary, the soil and where the gates go. You get a fixed price in writing within 1–3 days.

  3. Building

    The same person is on site from start to finish. The schedule is agreed in advance, and we keep you updated. If something unexpected shows up during demolition, any changes are always agreed before they're made.

  4. Handover

    We go through the work together, clean up after ourselves and give you care instructions.

06 / FAQ

Good question

Didn't find your answer? Call +358 44 724 5824 and let's talk.

Who pays for a fence on the boundary? + −

That's agreed with your neighbor. We recommend agreeing in writing on both where the fence goes and how the costs are shared before the work starts.

Does a fence need a permit? + −

It depends on the municipality. The building ordinance and the local detailed plan can limit the height and type of the fence, and a higher fence can need a permit or a notification. Check your own situation with your municipality's building control. The property owner always applies for the permit.

When is a railing required? + −

Always when the drop from the terrace or stairs is more than 50 cm, whatever the permit situation.

How long does it take to build a fence? + −

A typical fence for a detached house is done in a few days.

How does the pricing work? + −

The price is fixed before the work starts, after a free site visit.

Can I get the household deduction? + −

Yes, for the labor portion. The labor portion is shown separately on the invoice.

Do you take the old fence away? + −

Yes, when this is agreed in advance.

07 / Contact

Contact

Service area

We serve Espoo, Kauniainen, Kirkkonummi, Vihti, Lohja, Nurmijärvi, Sipoo and Inkoo. We also travel further to cottage and shore sites. Travel outside the service area is €1.00/km.

Attach photos of the site (optional)

Can't find what you're looking for? Call us and we'll help.

Vihti · Lohja · Espoo · Helsinki · Kirkkonummi

Call us – we serve in English and Finnish.